2002
Toronto Pearson International Airport.
Supplying labour and equipment as well as material for installation of fire protection and the DE mastics for terminal 1 and terminal 2 as a sub-contractor to Dufferin Construction and reconstruction sewers
2002-2003
Guelph Line road Service Reconstruction, Alwahesh Contracting worked along with Moretti Excavating to re-service a 4km sub-division in Milton. Clarkson Rd, Mainway mountain side dr and Sydney Dr were some of the streets serviced with new watermain including residential service connection, replacement of old sewers and saniatry lines with new lines and servicing for the houses and reconstruction of the roads.
2003 - 2004
Derry Road and Hwy 25 Water Main 900mm PVCIn 2003-2004 our company installed 900mm of PVC water main on Derry Road and Regional Road 25 to the sports center in Milton. The scope of work included the connection to the main line at RR 25 and Derry Road, and the jack and bore under the 16 Mile Creek in Milton to bring water to the sports center and finally the installation of fire hydrants and chambers
2009 - 2012
Oshawa Water Treatment Plant RCP and CPP. From 2009-2012 Alwahesh Contracting has been hired as the sub-contractor for replacing 1050mm CPP and 750mm CPP pipes and connections to the existing CPP main. Other work include the
installation of fire hydrants, side walk restorations, installation of new sanitary and storm PVC pipes, and installation of new maintenance holes
2010 - 2011
Halton Region Zone 5 Reservoir 900mm CPPIn 2010 Alwahesh Contracting was hired by Sierra Excavating as a sub-contractor to install 800 meters of 900mm CPP pipe on Hume Court from 3rd Side Road in Milton. This also included the installation of air release chambers and a connection to the proposed reservoir. As part of the contract we also pressure tested the line
2012 - 2013
Watermain and Sanitary Sewer Replacement on Fairview Street, In the City of Burlington.
Alwahesh Contracting Inc. installed 1.2 Kilometers of 300mm PVC watermain and 600 meters of 300mm PVC Sanitary line including all chambers , valves and hydrants
2011
City of Toronto Land Fill HDPE Leachate Collection Pipe.
In 2011 we installed 2.2km of a 10inch and an 8inch perforated HDPE leachate collector pipe, which included the installation of manholes. This installation was at an average depth of 7metres
2012-2013
Construction of 2100 meters of 750mm Concrete Pressure on Louis St. Laurent Ave. in Milton Ontario for the Region of Halton. Alwahesh Contracting Inc. installed 2100 meters of 750mm CPP including all chambers , valves and hydrants
2014
Watermain replacement on Cairncroft Road, in the Town of Oakville
Replacement of 300mm watermian including installation of precast valve chambers and fire hydrant.
Watermain Replacement on Plains Road East at Queensway Drive, in the City of Burlington
2015
Wastewater main Replacement and/or Rehabilitation on Hixon St and Nelson St in the Town of Oakville
Installation of 1200mm Precast manhole and replacemnt of 200mm & 300mm Sanitary pipe complete with full restoration
2016
Frozen Water Services Lowering Program, in the Town of Milton
25 Locations of repiaring and lowering water service for both residential and commercial
2017
Watermian Replacement on Oxford Ave from Oakdale Dr to Culham St and, Wastewater mian Replacement on MacDonald Road from Watson Ave to Guloucester Ave, in the Town of Oakville
2018
Frozen Water services Lowering Program, in the Town of Halton Hills
49 Locations of service repairs both Residential and Commercial.
2018
300mm Watermain Replacemtn on
Mississaga St, in the Town of Oakville
Over 890m of PVC and Insulated PVC Watermain and over 100m of 150mm Watermain from Rebecca St to Lakeshore Rd.
2019 -2020
Watermain Replacement on Normandy Place, Watermain and Wastewater main Replacement on John St, Wastewater Main Replacement on Brant St and Wilson St in the Town of Oakville.
Watermain Replacement on 14 Side Road from the Milton Reservoir (Zone M5G) to Tremaine Road (Regional Road 22) in the Town of Milton - Over 820 Meters' Installed of 300mm Watermain, 4 Fire Hydrants, Heavy Duty Silt Fence, backflow preventer.
Rebecca St. Watermain Connection Replacement and Navy St. Valve Replacement, in the Town of Oakville - Installation Of 500mm CPP, 500mm Of Ductile Iron Watermain Installed in Valve Chamber, Fire Hydrant, 900mm Steel Casing Installation Throughout Bridge . 500mm Butterfly Valve Installed in Valve Chamber.
Bridgeview Sewage Pumping Station, Forcemain
from Plain’s Road West to Botanical Drive and Spring Garden
Road, and Watermain on Spring Garden Road in the City of
Burlington
WATERMAIN REPLACEMENT ON ARCHDEKIN DRIVE AND REPAIR FROZEN SERVICES ON VARIOUS STREETS, CITY OF BRAMPTON, PROJECTS 22-1340 ASSIGNMENT E, PROJECTS 18-1301 AND 20-130
WATERMAIN REPLACEMENT ON CURIA CRESCENT, KELVEDON MEWS, MEADOWS BOULEVARD, MADIERA ROAD AND MISSENDEN CRESCENT, CITY OF MISSISSAUGA, PROJECT No. 22-1310 F, G, J AND SANITARY SEWER REPLACEMENT ON REDSTONE ROAD AND MISSENDEN CRESCENT, CITY OF MISSISSAUGA, PROJECT No. 22-2300 B